Water Production
   
  Banglen Water Treatment Plant is located on 69 rais of land. The plant is divided into two areas; 40 Rais is used for the production plant and other 29 rais is used for dry sludge disposal as land fill. The plant has a design capacity of 320,000 m3/day. This water is pumped a distance of 30km to Buddha Monthon Sai 5 pump station. At this location some of the water is pumped into the local distribution network and the remainder is transferred a further 20km to Mahachai pump station. The process of water treatment consists of the following significant sections:
   
  1. Raw Water Intake

2. Rapid Mixing Unit

3. Clarifier

4. Sand Filter

5. Post Chlorination

6. Clear Water Storage Tank

7. Sludge Treatment

8. Chemical Storage and Injection

9. Bulk Transmission Pump Station

10. Electrical Backup System

11. Online Analyzer

12. Surge Protection System
   
   
 
   
   
 